WOOD SOURCED HAVE BEEN SAWN TO SHAPE AND KEPT PROPERLY AND PROTECTED FROM RAIN UNTIL FULL BRICK LAYING WORKS ARE COMPLETE.
The Temple Committee had sourced for wood and have already sawn them into the required shapes mostly by using the computer-aided design shop.
These sawn wood could only be fixed once the brick laying works are complete. There is still a few layers of bricks that need to be laid. Once this works are completed then the wood sourced and sawn to shape would be fixed (to appear as shown in red as shown in the picture of the lay-out structure).
The wood sourced and now fully sawn to shape are stacked in a covered area as shown below to be protected from rain: